Case Studies

  • Benefits of CHP Performance Monitoring

    Windsor Leisure Centre installed a Combined Heat and Power (CHP) unit in March 2010 to generate electricity on-site and to provide hot water for the leisure centre. Periodically however the CHP unit 'trips' and stops generating electricity but this is not immediately apparent to the leisure centre staff as everything else on-site functions normally; they just use more grid electricity.

  • RB of Windsor and Maidenhead

    With a desire to improve the energy performance of their buildings, the Royal Borough of Windsor and Maidenhead (RBWM) contacted TR Control Solutions Ltd in 2008 looking for a system that would enable them to monitor and promote their energy performance to both their staff and their customers.

  • Mole Valley District Council

    Mole Valley District Council embark upon mission to reduce internal carbon footprint by 35% by 2015 with the help of eco|Driver®.

  • Kings Lynn and West Norfolk Borough Council

    King’s Lynn & West Norfolk Borough Council contacted TR Control Solutions Ltd in 2008 looking for a system that would enable them to both monitor and promote their energy performance to both their staff and their customers.